Skip to content
Inspection

Inspection

Dimensional inspection by CMM, optical measurement and calibrated instruments, reported against your drawing so the numbers are verifiable.

Methods
CMM, optical measurement, height gauges, bore gauges, micrometers
Reports
First article inspection and dimensional reports
Sampling
Full inspection on first article, defined checks in process
Environment
Temperature-controlled inspection area for precision work

How we hold this quality

Drawing-based reporting

Reports follow your drawing's dimensions and datums, so your engineer can read the results directly against the print instead of cross-referencing our format.

Model-based verification

For sculpted and free-form parts, measured points are compared against the CAD model and the deviation is reported as a colour map.

Critical features first

Fit, function and safety features are measured first and are always included in the report, regardless of how the rest of the part is sampled.

Traceable records

Inspection results are stored against the order, so a later question about a delivered batch can be answered with data rather than recollection.

Inspection is how a manufactured part becomes a verifiable one. The measurement plan is derived from your drawing, and the report is structured so your engineer can check it without interpretation.

What we measure and how

  • CMM for position, form and profile on complex parts and multi-face geometry.
  • Optical measurement for small features, edges and fragile parts that should not be touched by a contact probe.
  • Calibrated hand instruments — micrometers, bore gauges, height gauges and thread gauges — for fast in-process checks.

Reports and documentation

A first article inspection report accompanies new parts and new tooling. Production batches can be supplied with dimensional reports, material certificates and finish certificates. Tell us which features are critical and the report will prioritise them.

Process & part gallery

Parts checked against a fixtured datum
Batch of parts prepared for dimensional inspection

How it works

From drawing to delivered part

  1. 1

    Send drawings

    Upload STEP, IGES, DXF or PDF files with material, quantity and finish.

  2. 2

    Engineering review

    We check manufacturability, tolerances and finish for this process.

  3. 3

    Quote and approve

    You receive unit price, lead time and any design questions in writing.

  4. 4

    Produce & inspect

    Manufacturing runs against an agreed inspection plan.

  5. 5

    Ship and support

    Parts are packed, documented and shipped, with support for revisions.

FAQ

Inspection — frequently asked questions

What is included in a first article inspection report?

The ballooned drawing with each inspected dimension numbered, the measured values, the nominal and tolerance, and the pass or fail result — plus material and finish certificates where they apply.

Do you inspect every part?

The first article is fully inspected. During the run we inspect the features identified in the inspection plan at defined intervals; for critical or low-volume parts, that can mean every piece.

Can you inspect parts you did not manufacture?

Yes. We can measure incoming or returned parts and supply a report against your drawing, which is useful for supplier comparison or failure investigation.

Related processes

Start a project

Request a inspection quotation

Upload your CAD files with the material, quantity and finish. Our engineers will review the drawing and reply with pricing and lead time.